Estimated Detail In General

Preparation of Detailed Estimates

The main purpose of making a detailed estimate is for the procurement of a job or project and as a basis intuk evaluation and control of the project, carried out a comparison between "what happened" with "what should be happening". In this case to see the progress of a project will be compared between the cost had recently issued a budget plan that has been set. General contractor to estimate the details according to UCI format (Uniform Construction Index). Estimates for the general contractor organization is divided according to the 16 divisions.

Estimator required to make the system capable of accommodating the cost estimates for sub-contractors for all divisions so that all the items within the scope of work covered in the sub-contractor that the contractor bidding on projects aimed for the owner. UCI format is divided into 16 main events with code that has been given, namely:

                                              Uniform Construction Index


Stages in building a detailed estimate that is:
- Perform the calculation as the volume of material that will be used in project implementation
- Peroses assignment, which at this stage estimator to calculate the estimated cost of material, labor, subcontracting, equipment and other
- Stages of the recapitulation, a summary estimate of the order of work, serves to calculate the various overhead costs such as taxes, insurance and guarantees. This stage is a general description of the estimation