Sunday, March 4, 2012

Cost Budgeting

Estimates of activity in construction projects carried out with a specific purpose depending on the party who made it. Party owner to make estimates in order to obtain clarity about the costs that must he made available to realize the project. The results of these estimates are referred to as OE (Owner Estimate) or EE (Engineer Estimate). The contractor to make estimates for the purpose of bidding against proyekn kegiatab construction.

The contractor will win the auction if the proposed approach offers OE / EE. The range is still acceptable to the owner will be discussed in a separate chapter, which is about the auction. In determining the offering price, the contractor must include other aspects in which if the later will affect the cost of the project.

steps taken to prepare the budget is as follows:
- To collect data about the type, price and market ability to provide the materials / construction material to continue

- Conduct data collection on the wages prevailing in the area of ​​the project site and Utau wages in general, if the workers brought in from outside the project site

- Perform calculations and analysis of materials by using the analysis of wages in both believed by the creator of the budget. In the market there is a book BOW (Burgelijke Openbare Werken).

- Perform the calculation of unit prices of work by utilizing the results of the analysis unit of work and list the quantity of work

- Create a recapitulation

0 komentar:

Post a Comment